Charité in Berlin-Mitte is one of the oldest hospital facilities in Germany. As one of the first steps of the campus renovation, ‘Bettenhaus’ Ward Building Charité Mitte underwent comprehensive refurbishment until 2016 and a new building for the OR, intensive care medicine and emergency room was built at the same time. More steps will follow.

The history of Charité dates back to 1710. At that time, King Friedrich I had a pest house built outside the city’s gates. Since the plague spared Berlin, the house served as a hospice until the King designated it as a hospital and training center for military doctors under the name “Charité” in 1727.

Since then, the historic campus, which is now located in the middle of the city, has been rebuilt, expanded, destroyed and rebuilt over and over again. Among other things, ‘Bettenhaus’ Ward Building Charité Mitte was modernised and comprehensively renovated in the 1980s. During the refurbishment, the building was also equipped with a new, energy-efficient facade, and the functional rooms and rooms for patients and staff were adapted to modern standards and comfort requirements.

Berlinkarte

Development of Campus Charité Mitte

Campus Charité Mitte

Campus Virchow-Klinikum

Campus Berlin Buch

Campus Benjamin Franklin

  • |
  • |
  • |
  • |
  • |
  • |
  • |

Rahel Hirsch Center for Translational Medicine

Rahel Hirsch Center for Translational Medicine

Completion 2022

More

BMM

Charité Museum of Medical History Berlin

Upgrading 2023

More

Research Center at Hessische Strasse

Research Center at Hessische Strasse

Refurbishment 2020

More

Psychiatry and Psychotherapy Clinic

Psychiatry and Psychotherapy Clinic

Refurbishment 2022

More

Friedrich Busch Building

Friedrich Busch Building

Refurbishment 2023

Aschheim Zondek Building

Aschheim Zondek Building

Refurbishment 2025

IT DC I

IT Data Center I

Establishment in 2020 at basement level

More

BHH

High-rise ward and new construction of the operating room, intensive care station and emergency department

Refurbishment 2016

More

BHH

High-rise ward and new construction of the operating room, intensive care station and emergency department

Refurbishment 2016

More

Diagnostic Center

Diagnostic Center

More

North entrance

Ideas competition north entrance and new research building

More

CCO

Charité Cross Over Building

Completion 2012

More

Alexanderufer

DHZC

German Heart Centre at Charité (DHZC)

New construction in 2028

More

BeCAT

Berlin Center for Advanced Therapies (BeCAT)

New construction in 2023

More

Si-M

The simulated Human (Si-M)

New construction in 2023

More

Infrastructure South

Renewal of Infrastructure South

New construction in 2024

More

Pharmaceutical Center

Pharmaceutical Center

1st construction phase until 2026, 2nd until 2030.

More

Pharmaceutical Center

Pharmaceutical Center

1st construction phase until 2026, 2nd until 2030.

More

Biobank

Biobank

New construction in 2016

More

NCT

National Center for Tumour Diseases

New construction in 2030

Eckernförder Platz

Eckernförder Platz

Südschiene 1st construction phase

Südschiene 2nd construction phase

Südschiene 3rd construction phase

Old car park

Old car park

Nordschiene 1st construction phase

Nordschiene 2nd construction phase

Teaching Forum

Southern district

Southern district

Southern district

Southern district

OR level (5th floor)

Refurbishment of the OR level (5th floor)

Completion: 1st construction phase 2020, 2nd construction phase 2023

More

SPS I (3rd floor – 6th floor)

Ward I

Refurbishments 2022

More

SPS II (3rd floor – 6th floor)

Ward II

Refurbishments 2023/24

More

SPS III (4th and 6th floor)

Ward III

Refurbishment 2025

More

CCK Süd

Establishment of an temporary ward (CCK Süd)

2020

More

HuLa

Helicopter landing pad with hangar

New construction in 2021

More

HuLa

Helicopter landing pad with hangar

New construction in 2021

More

IT DC II

IT Data Center II

2023

More

Life Science Campus

Life Science Campus

2050

Total refurbishment

Total refurbishment

By 2027

Fraunhofer Institute of Allergology

Fraunhofer Institute of Allergology

Installation 2024

New hospital building 1st construction phase

New hospital building 1st construction phase

ZNA and replacement bed area By 2030

New hospital building 2nd construction phase

New hospital building 2nd construction phase

By 2040

Research Institutes for Experimental Medicine

Research Institutes for Experimental Medicine

Käthe Beutler Building

Käthe Beutler Building

More

The heart of Healthcare City Berlin

Due to its location in the heart of the city, Campus Charité Mitte is predestined to make a significant contribution to shaping “Healthcare City Berlin 2030”. Charité sees the campus as a future hub and interface for an internal and external network. A whole host of connectivity options in the immediate vicinity of important institutions such as the Humboldt University, the Natural History Museum and numerous other research and medical partners. This is also to be utilised at Campus Charité Mitte in the form of shared facilities. In addition, the historic building structure is to be intelligently combined with new architectural paths.

A multi-level competitive dialogue process is planned for the campus in 2022. This includes the Senate Department for Urban Development and Housing, the Senate Chancellery – Science and Research as well as the Berlin-Mitte District Office and the state authorities responsible for the preservation of regional monuments.

Broschüre CCM
Brochure - “Competitive Dialogue on Overall Urban Development CCM”
Read brochure in the media library
The new Campus Charité Mitte in figures
Current usable area
166,000 m²
Master planning period
2021–2050
Estimated required investment
EUR 1.77 billion

High-performance medicine on the historic campus

Charité is synonymous with cutting-edge research and humanity. Both will come together on the path to a structural vision for Campus Charité Mitte: with new research centers and buildings for the care of patients. The aim of the master planning is to strike a balance between tradition and the future. Charité, which is the driving force behind the Healthcare City, is also to become even more visible in terms of architecture and city planning.

Charité also wants to promote and develop dialogue with people. One example of this is the Rahel Hirsch Center for Translational Medicine, which is currently being developed and is being expanded into a meeting place for science and society. The Rahel Hirsch Center for Translational Medicine is being created for Charité and the Berlin Institute of Health at Charité (BIH@Charité) from the former building for the OR, ICU and emergency station. Rooms for research, outpatient clinics and therapy as well as for administration, events and exhibitions are being built on a usable area of around 15,000 square metres. The spatial connection with the central hospital building at Campus Charité Mitte provides the ideal conditions for dealing with clinical research questions.